Sikkim

NH-10 blocked at 29th mile, Sikkim- Siliguri Road

National Highway NH 10 blocked at 29th mile, Sikkim- Siliguri connection since 7 Am today morning which had triggered a landslide on the National Highway-10 at 29th mile, Siliguri, West Bengal, which is also strategic link road connecting Sikkim with the plains of Siliguri.

Today Morning it has been reported that Landslide at 29 Miles, near Siliguri, has blocked the highway on Sunday morning.

The NH-10 connects Sikkim’s Rangpo to Kalimpong district, Darjeeling, and Siliguri town. An orange alert has also been sounded by the MeT department in the Darjeeling and Kalimpong districts of West Bengal and in neighboring Sikkim as the region is likely to experience heavy rainfall over the next few days.

According to reports, the incessant rainfall, starting on Saturday evening, led to several landslides in a large part of NH-10 Highway disrupting vehicular movement on the connecting stretch.

Since last 24 hour the region had witnessed torrential rainfall in North Bengal and Sikkim. Last day, Teesta river water was also seen coming till Highway Road.

At 8 AM, today, Sunday morning the administration rushed into the landslide spot and is currently working out clearing up operations, local sources said.

“After the landslide was reported nearby we arrived at around 8 am to clear it. The road was already closed, the landslide was reported in other places as well. Mud, rocks and debris had accumulated on the road” said the local administration who was seen reaching on the spot to clear the road.

Watch Video – Road Blocked on 29th Mile

Jeewan Dahal

I have done training in Neuro-linguistic programming. Based in Sikkim, own The Sikkim Today & Hillrooms- supporting the growth of entrepreneurship around the NorthEast.

Recent Posts

Minister Ven Sonam Lama Meets Union Home Minister Amit Shah

Minister for Ecclesiastical Affairs, Public Health Engineering (PHE), and Water Resources (WR), Ven Sonam Lama,…

3 days ago

New Suspension Bridge Opens in Upper Dzongu

A landmark day for connectivity in Upper Dzongu as the Minister for Forest & Environment,…

3 days ago

Operation Clean Sky: Gangtok Tightens Cable Management to Restore Urban Order

The District Administrative Centre (DAC), Gangtok, has intensified efforts under Operation Clean Sky to tackle…

3 days ago

Cybercrime Case in Soreng: Elderly Man Loses ₹10 Lakh in Digital Arrest Fraud

Sombaria Police Station has registered a cybercrime case after a 66-year-old man from Daramdin, Soreng…

4 days ago

CM PS Tamang Meets New Sikkim University VC Prof. Santanu Kumar Swain

Chief Minister Prem Singh Tamang extended a warm welcome to the newly appointed Vice Chancellor…

4 days ago

Sikkim Educator Selected for National Teachers’ Award 2025

Karma Tempo Ethenpa, Principal of PM SHRI Government Senior Secondary School, Mangan, has been selected…

4 days ago